During many years of CADKON programs being available so many of our customers have used it to help create their projects more efficiently. Take a look at the selected projects to get an idea in which areas our programs can be used to create project documentation.
BECHERPLATZ developed from remodelling the 170 year old factory where the world-renowned liquor Becherovka was produced.
Several buildings were used for production, bottling and expedition of Carlsbad liquor BECHEROVKA. There was a Becherovka museum and shop on the 1st above ground floor and basement. The 2nd floor served as administrative premises and higher floors as company flats.
The remodelling of the former Becherovka factory created an area of tourism in the very centre of Carlsbad. Its features evoke atmoshpere of the traditional town square from the 19th century where people can rest in a coffee shop Kaffee Magazin or buy souvenirs, delicacies or the Charles IV beer. You can descend from the town square by oak stairs directly to an original restaurant and brewery called Charles IV.
The building is located on the land registred to the village of Popice, beyond a second landscape shift north from village Stará hora. It is an example of a winery built a modern style which was chosen as "The best industry building of the South Moravian Region of 2009" .
Prior to urban solution, a terrain and landscape study was conducted, paying special attention to the country side and its phenomenons. Sloping hills, landscape of wine region, predomininatly easterly winds, wine orchard and most of all the panoramatic view of Pálava hills and water reservoir Nové Mlýny, became the determining factors of the construction.
Projection of these elements into the urban modern object is the main theme of the whole project and it determines the building in light of shape, size and function.
The building is closely bound with the landscape that it is growing from, it is built into the slope which is partially covering it.
As well as the fun pool, the relaxation pool is an extension of the water attraction capacity in Aquacity Poprad area. It is an all-season roofed heated pool which will increase the thermal water utilization for relaxing baths by designing a perfectly shaped and sized pool.
Prevádzkovo is a relaxation pool connected to existing premises of Aquacity using its sanitation facilities (changing and dressing rooms). It will be operating in the same regime as the existing pools including the admission system.
A new school canteen, also providing meals to public, will be placed in the town centre monument zone of Mnichovo Hradiště and it will replace the current canteen.
A wall from a raw reinforced concrete, designed alongside a road, will be bent in a circular arc on the corner creating a "barrier" on the boundary: public area X inner area. While there will be circular holes in the reinforced concrete wall, the northwest and southwest exterior will be simple with white rendering with uniform square and rectangular holes.
There will be two separate canteens, one for students, the other for public, separated by a block with kitchen. Construction system is designed as a load-bearing wall system, stud framed. Foundation constructions are made by concrete stirps and load-bearing walls will be made up of porous concrete blocks (apart from the peripheral reinforced concrete wall). Ceiling is projected as combined from prefabricated reinforced concrete ceiling blocks and monolithic reinforced concrete (above the public canteen).
This project deals with a revitalization of a precious national cultural monument with respect to its historical value. The main aim of the project is to maximize use of the unused monastery premises - to create premises for an educational and cultural centre serving both professionals and public. Premises are designed with respect to current space arrangement in order to minimalize any necessary demolitions.
The project documentation required modelling of a current state of the building (individual floor plans, sections, views, site plans) and consequently the project documentation for consolidated territorial and building proceedings.
This projection documentation deals with a newly built apartment block with 14 house units and a car showroom. The original car showroom is not compliant with current requirements for modern car retail therefore the object needs a total reconstruction which is object of this project documentation. The purpose of the premises remains unchanged, only flats in 3rd to 6th floor are added. The bottom part of the building, the car showroom with its two floors, occupies approximately the same space as the original one. Mass of the upper part of the building gives in in the north to the neighbouring house and takes up only about two thirds of the showroom's floor plan. The rest of the showroom's roof area is made of green vegetation and 3rd floor flats terraces.